Strek-O Doors will be closed

the following days 

to celebrate the holidays:

November 22nd & 23rd, 2018

December 24th & 25th, 2018

January 1st, 2019

 xmas2



fsc logo

  • Doors should be stored flat in a dry, well ventilated building
  • Do not allow to come in contact with water
  • Keep doors 4″ off the floor with a protective covering under the bottom and over the top
  • Avoid exposure to direct sunlight
  • Do not subject doors to extreme heat, cold and/or humidity
  • HVAC systems should be operating and balanced in the building where doors are being stored
  • Do not install doors in building that have wet plaster or cement
  • Always handle doors with clean dry hands or while wearing clean dry gloves
  • Do not drag doors across one another, they should be lifted and carried when being moved